نعمل الآن على ترجمة هذا المقال إلى العربية — ستظهر الترجمة هنا بعد لحظات. نعرض لك في الأثناء النص الأصلي باللغة الإنجليزية.

ECG announces planned power outages in four regions for March 25

The Electricity Company of Ghana (ECG) has announced a series of planned maintenance exercises scheduled for Wednesday, March 25, 2026, across the Tema, Central, Accra East, and Accra West regions. The exercises, aimed at enhancing service reliability and strengthening the stability of the national grid, are expected to cause interruptions starting from 9:00 am in…

نُشر في مدة القراءة: 2 د

The Electricity Company of Ghana (ECG) has announced a series of planned maintenance exercises scheduled for Wednesday, March 25, 2026, across the Tema, Central, Accra East, and Accra West regions.

The exercises, aimed at enhancing service reliability and strengthening the stability of the national grid, are expected to cause interruptions starting from 9:00 am in most affected areas, with durations varying by location.

Tema Region

A planned maintenance exercise will run from 9:00 am to 4:00 pm, affecting communities including:

· Aunty Araba, Jordan City, Katamanso, Promise Land, Lorlornyo
· Akrade, Senchi, Atimpoku, Akwamufie, Juapong, Tagadzi, Dorfor, Adidome
· Volo, Vome, Pordoe, Kissifui, Kpota, Mpakadam, Apegusu
· Frankadua, Osiabura, Asikuma, Anum, Boso, and surrounding areas.

Central Region

Two separate maintenance operations will take place from 9:00 am to 4:00 pm:

  1. Areas: Afrangua, Mpesedaudze, Obokor, Jedu, Abandze, Egyaa Nos. 1, 2, and 3, Briwa, Asafora, Barrier, parts of Anomabo, and surrounding areas.
  2. Areas: Moree, Pedu, the Regional Police headquarters, 4th Ridge, Tsibu Darko, Abura, Eyifua, Kakumdo, Esuekyir, CCTU, Bonkus, Basakrom, Wiamoa, Edukrom, Krobo, Nframandwir, Kwakye, Sekyere Hemang, and surrounding communities.

Accra East Region

A maintenance operation will run from 9:00 am to 5:00 pm, affecting:

· Lakeside Community 1 and 5, New Legon, Abokobi Boi, Comet Estates
· KNUST City Campus, parts of GIMPA Campus, parts of North Dzorwulu, parts of Tseaddo, and surrounding areas.

Accra West Region

An eight-hour exercise from 9:00 am to 5:00 pm will affect:

· Nkrumah Flats, Tesano Baptist Church, and surrounding areas.

The scheduled maintenance follows unplanned outages on Tuesday caused by network faults in parts of the Central, Accra West, and Accra East Regions. Engineers were deployed to resolve those faults and restore power.

ECG apologized to customers for the inconvenience caused by both the unplanned faults and the scheduled maintenance, assuring the public that the exercises are necessary for the long-term robustness of the power network.

شارك هذا الخبر

اشترك في النشرة الإخبارية لـ AfroAsia Media

أبرز أخبار اليوم من أفريقيا وآسيا، مباشرةً إلى بريدك الإلكتروني.

التعليقات

عدد التعليقات: 0

جارٍ التحميل…

أخبارمدة القراءة: 3 د

وزير المالية الغاني يقول إن 22 قانوناً سُنّت خلال 18 شهراً لتثبيت الإصلاحات الاقتصادية

كشف وزير المالية الغاني، الدكتور كاسيل أتو فورسون، أن الحكومة قدّمت نحو 22 قانوناً خلال الأشهر الثمانية عشر الماضية كجزء من استراتيجية متعمدة لإضفاء ا...

أخبارمدة القراءة: 3 د

ماهاما يعلن انتهاء أزمة «دومسور» في غانا ويعزو استقرار إمدادات الكهرباء إلى تسوية ديون منتجي الطاقة المستقلين

أعلن الرئيس جون دراماني ماهاما أن غانا تمتلك الآن إمدادات كافية من الكهرباء ولم تعد تعاني من انقطاعات التيار المعروفة بـ«دومسور»، عازياً هذا التحول إل...

أخبارمدة القراءة: 4 د

تراجع أسعار الفائدة على الإقراض يعزز آفاق مشاريع الشباب، وفقاً لمحافظ بنك غانا

سلّط محافظ بنك غانا (BoG)، الدكتور جونسون بانديت أسياما، الضوء على الانخفاضات الحادة في أسعار الفائدة على الإقراض وتحسن الوصول إلى الائتمان باعتبارهما...

أخبارمدة القراءة: 4 د

جهاز الإحصاء الغاني يطلق إصدار "غانا بالأرقام 2025" لتثبيت دعائم التخطيط الوطني

أطلق جهاز الإحصاء الغاني (GSS) إصدار "غانا بالأرقام 2025"، وهو أول إصدار رئيسي يجمع الإحصاءات الرسمية للبلاد ويوضح كيف يمكنها توجيه صنع القرار في قطاع...